Rm.136,Lin he Zhong Rd. TianHe, Guangzhou, China.
Name |
nylon big large plastic gear for industry |
Material |
Nylon, ABS, PMMA, PC, PP, PEEK, PU, POM, PE, UPE, PTFE, etc. |
Color |
White, black, green, nature, blue, yellow, etc |
Diameter |
customized |
Tolerance |
±0.05 |
Shape |
As per your drawing Or the sample |
Certification |
ISO9001, SGS, Test Report, RoSH |
Free Sample |
Available |
Shape |
Sheet, rod, tube, gear, pulley, guide rail, and Plastic parts so on |
Advantage |
One-stop procurement |
Other |
24-hour instant and comfortable customer service. |
Shipping status notification during delivery. |
|
Regular notification of new styles & hot-selling styles. |
Item | RESULT | UNIT |
Mechanical properties | ||
Modulus of elasticity | 1000 | MPa |
Modulus of elasticity | 1000 - 1400 | MPa |
Tensile strength at yield | 25 | MPa |
Impact strength (Charpy) | 140 | Kj/m 2 |
Notched Impact stren. (Charpy) | No break | Kj/m 2 |
Ball indentation hardness | 50 | MPa |
Creep rupture strength | 12,50 | MPa |
Time yield limit | 3 | MPa |
Coefficient of friction | 0,29 | ------ |
Thermal properties | ||
Glass transition temperature | -95 | °C |
Crystalline melting point | 130 | °C |
Service temperature | 90 | °C |
Service temperature | 80 | °C |
Thermal expansion | 13 - 15 | 10-5K-1 |
Specific heat | 1,70 - 2,00 | J/(g+K) |
Thermal conductivity | 0,35 - 0,43 | W/(K+m) |
Heat distortion temperature | 42 - 49 | °C |
Heat distortion temperature | 70 - 85 | °C |
1. Q: What color can you make?
A: Usually, we can make the regular colors, like green, blue, black, yellow, grey, and so on. Or you can offer the Pantone color number for reference to produce.
2. Q: What is your MOQ?
A: It depends on the drawing.
3. Q: What is your delivery time?
A: It depends on the volume; usually, it is about 7 days.
4. Q: How can I get a sample?
A: The small size of the sample is free; you only need to pay for the shipping cost, or you can provide your UPS, DHL, FedEx, or TNT courier account to us. Customized size of the sample should be charged.
5. Q: What is your payment?
A:30% T/T in advance, balance before shipment. Other terms negotiable.